adult-architect-architectural-design

MASTER PLANNING

  • A feasibility study is an analysis used in measuring the ability and likelihood to complete a project successfully including all relevant factors
  • Financial Budgeting is the process of creating a plan to spend your money.
  • Site Massing is a term in architecture which refers to the perception of the general shape and form as well as size of a building
  • Land use review consists of the review and approval of all land use proposals, including annexation, site review, use review, and preliminary plat.
  • Building Performance Evaluation (BPE) is a tested and defined method that can be adopted to measure and monitor building performance before, during and after building projects.
  • Program management is the process of managing several related projects, often with the intention of improving an organization’s performance.

DESIGN DEVELOPMENT

  • Design firm Representatives, bidding & selection is an offer to set a price by an individual or business firm for a product or service or a demand that something be done.
  • A design schedule is an estimate of the schedule for a particular action. Design schedule estimates for individual actions are rolled up into design schedule estimates for a project.
  • Design oversight & coordination covers Contaminated soil excavation, Capping, Lead stabilization, Bioremediation, Soil vapor extraction etc.
  • Detailed end-user reviews, the end user stands in contrast to users who support or maintain the product.
  • Constructability review and multi-discipline design coordination covers Environmental safety, Constructability, Operability, Maintainability, Technical integrity, Contractual requirements
  • Approved drawing means that drawings and documents are reviewed and approved by authorities of internal and external organizations including the client team members of the construction.
  • The design documentation provides written documentation of the design factors and the choices the architect has made in the design to satisfy the business and technical requirements.

SITE DEVELOPMENT

  • Design consultation & management of a site provide engineering-related services such as design, supervision, execution, repair, operation, maintenance, technology, creation of drawings and specifications
  • Approvals and permitting covers all the approval needed for construction or expansion.
  • Design firm Representatives, bidding & selection is an offer to set a price by an individual or business firm for a product or service or a demand that something be done.
  • Project Construction Management (PCM) is a professional service that uses specialized, project management techniques to oversee the planning, design, and construction of a project, from its beginning to its end.
  • Utility coordination and service connection including power, telephone, gas, water, and sewer service connection, involve installation and coordination.

CORE SHELL

    • Building programming & design refers to computer aided design of different structures.
    • Constructability reviews are routinely performed throughout the industry, but with mixed results. These varied results are driven by many factors, but the most predominant factors are the reviewer’s experience level and amount of time allotted to complete the review.
    • Design firm Representatives, bidding & selection is an offer to set a price by an individual or business firm for a product or service or a demand that something be done.
    • Project budgeting is determining the total amount of money that is allocated for the project to use. The project budget has been estimated by the project manager and or the project management team.
    • Project management through turnover is a responsibility transfer work process, giving of care, custody, and control (CCC) for project to owner at the final stage of project after the plant is constructed, inspected and tested.

PRE-DEVELOPMENT

INTERIORS

  • Design management and consultation covers the management and consultation of interiors design of residential, commercial and industrial buildings.
  • Project budgeting is determining the total amount of money that is allocated for the project to use. The project budget has been estimated by the project manager and or the project management team.
  • Approvals and permitting covers all the approval needed for construction or expansion.
  • Construction Management (with direct subcontractors) is a professional service that uses specialized, project management techniques to oversee the planning, design, and construction of a project, from its beginning to its end.
  • Project execution through turnover & occupancy is a responsibility transfer work process, giving of care, custody, and control (CCC) for project to owner at the final stage of project

PRE-DEVELOPMENT

  • Requirement Evaluation Values are used to record the actual value of requirement at a given point in time within the scope of a Requirement Evaluation.
  • A memorandum of understanding (MoU) is a type of agreement between two (bilateral) or more (multilateral) parties. It expresses a convergence of will between the parties, indicating an intended common line of action.
  • A letter of intent (LoI) is a document outlining one or more agreements between two or more parties before the agreements are finalized.
  • Due diligence is an investigation or audit of a potential investment or product to confirm all facts, such as reviewing all financial records, plus anything else deemed material.
  • Site selection involves measuring the needs of a new project against the merits of potential locations.
  • Design Coordination aims to coordinate all service design activities, processes and resources.
  • Approvals and permitting covers all the approval needed for construction or expansion.
  • Soil test covers the analysis of soil types and bearing capacity of different soil sample.