It brings us great pleasure, as Naif Engineering & Builders Ltd., to announce that we are working on constructing the project “Home Appliances Plant Con. Singer (BD)” at Araihazar, Narayanganj, Dhaka.
The company “Singer Bangladesh Limited” owns and funds it. Singer Bangladesh Limited is a Multi-National Company operating since 1905 in Bangladesh. It is a Retail Company marketing and manufacturing multi-brand and multi product consumer durable products. It was incorporated as a Private Limited company in 1979 and converted into a Public Limited Company in 1983 by offering shares to the public. It has the largest chain of retail stores branded as Singer Plus, Singer Mega & Singer Pro.
Singer Bangladesh Limited appointed Japanese company “TOA CORPORATION” as the main contractor. Furthermore, we are grateful to TOA Corporation for giving us the opportunity to take part in this project as the primary subcontractor for the “Home Appliances Plant Con. Singer (BD)”.
Since its founding in 1908, TOA CORPORATION has worked on projects such as dredging and reclamation for the construction of harbors and the facilities that go with them, designing and building buildings along the coast, and building airports, marine recreation areas, distribution warehouses, factories, and power plants.
TOA has completed several projects for urban development, commercial buildings, hotels, medical, educational, cultural, and residential facilities using cutting-edge technology, and has established a solid reputation for each and every design, execution of construction, and upkeep.
Project Specifics:
135,000 square meter total area, Economic zone.
Manufacturing facility for Singer is part of the project.
Consultancy and construction are the two main aspects of our activity.
Facility from us:
- Own “Vehicle Equipment” for mobilization and quicker work
- Own “Ready-Mix Plant” for casting
- Own “Total-Station” & Experienced Surveyor
- Own “Pre-cast Pile Driving” facility
- Own Highly Experienced Civil Engineers
Volume of work
– Area Under Survey: More Than 134,998.387 square meter Square Feet
Greater than 300,000 cubic feet of ready-mix concrete.
Working process:
1. Earth cutting & backfilling,
2. Sandkhoa Compaction / Macadam,
3. C.C casting,
4. Pile head breaking,
5. Pile cap casting,
6. Short columns casting,
7. Grade beam casting,
8. Columns casting,
9. Slab casting,
10. Civil work for industrial building.
The first phase of the project, which extends up to the plinth level, is now being worked on. Only 20% of the work has been completed thus far. The job is moving forward at full speed and will be finished in the allotted time.